{"product_id":"braemar-drain-valve-shutoff-24v-with-long-lead","title":"Braemar Drain Valve \u0026 Shutoff 24V with Long Lead","description":"\u003cp\u003e\u003cstrong\u003eBraemar Drain Valve \u0026amp; Shutoff 24V with Long Lead\u003c\/strong\u003e\u003c\/p\u003e\u003cp\u003eThe Braemar \u0026amp; Breezair drain valve shut off is a genuine replacement solenoid valve designed to control water drainage in evaporative cooling systems. Engineered for compatibility with Braemar and Breezair units, it ensures efficient water management and system protection. With a 24VAC operating voltage and robust construction, this valve supports reliable performance in residential and commercial installations. Ideal for servicing EM, ES, and EV series models, it’s trusted by HVAC professionals for its durability and ease of installation.\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eFeatures:\u003c\/strong\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003eGenuine Braemar \/ Breezair part (cross-reference: 107684, 105345)\u003c\/li\u003e\n\u003cli\u003eSolenoid-operated shutoff valve for evaporative coolers\u003c\/li\u003e\n\u003cli\u003e24VAC input for standard HVAC control systems\u003c\/li\u003e\n\u003cli\u003eDurable construction for high-moisture environments\u003c\/li\u003e\n\u003cli\u003eSupports efficient water drainage and system protection\u003c\/li\u003e\n\u003cli\u003eEasy to install with standard fittings\u003c\/li\u003e\n\u003cli\u003eWidely used by technicians across Australia\u003c\/li\u003e\n\u003c\/ul\u003e\u003cp\u003e\u003cstrong\u003eSuits Models:\u003c\/strong\u003e\u003c\/p\u003e\u003cp\u003eBreezair - EXQ, EZQ, EXS, EXD, EZD, EXH, EZH, Braemar - BMQ, LCQ, LCS, LCB, Coolair - CVP, CPL, CPS, CPQ\u003c\/p\u003e","brand":"Opaque White Goods","offers":[{"title":"Default Title","offer_id":51992136581412,"sku":"AC149_LONG_","price":420.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0799\/9737\/0660\/files\/13110_5c5e2c78.jpg?v=1776207309","url":"https:\/\/opaquewhitegoods.com.au\/products\/braemar-drain-valve-shutoff-24v-with-long-lead","provider":"Opaque White Goods","version":"1.0","type":"link"}